Urban plan Boslaan Hoofddorp

The site occupies a distinctive location on the corner of Kruisweg and Boslaan, close to the center of Hoofddorp. Behind the houses along Kruisweg currently lies a hidden world of warehouses and industrial buildings. This existing business area will be transformed into a residential neighborhood. At this point, the larger scale of developments such as Gemaalhuis and Hyde Park transitions into the smaller grain of detached houses along the historic axis of the Kruisweg, leading toward the town center.

The new residential area will be characterized by:

  • a green living environment;

  • being well-connected rather than isolated, integrated with the surrounding neighborhoods;

  • as many car-free living streets as possible;

  • parking accommodated within green courtyards;

  • slow-traffic routes (for pedestrians and cyclists) that connect with adjacent neighborhoods and create new visual corridors;

  • an architectural landmark along the Kagertocht, responding to the larger scale of Hyde Park, which lies diagonally opposite the site.

Architects Thomas Gillet
Related

In cooperation with Smits bouwbedrijf, VVKH has won the european tender to develop a new housingarea in district Dieperhout in Leiden. The project consists of 48 dwellings, 12 apartments and a care facility of 1500m². Start of the constructionwork is planned in may 2015, because thats when a current school will move to a new building and the site will be available.

In the summer of 2024, the municipality of Leiden launched an ideas competition for the Second Green Ring. Following the success of the Singelpark around the historic city center, the idea emerged to connect the parks and waterways along the city’s edge into one continuous whole — a green-blue ring where residents of the densely built city can recreate, exercise, experience nature, and meet one another.

Studio VVKH, together with partners in the fields of landscape architecture, water management, ecology, and industrial design, submitted a vision titled ‘Het Leidse Lint’ (“The Leiden Ribbon”). With this vision, we were among the three finalists invited to present their plans to a broad jury in March of this year. The citizens of Leiden were also able to view the proposals and share their opinions.

Our submission achieved second place. The winning proposal was ‘Panoramapark’ by Polyfern. We are proud of this result and greatly enjoyed developing our ideas for the city. The importance of outdoor space — for people, plants, and animals alike — will increasingly come to the forefront of design at all scales in the years ahead.

You can download the presentation boards of ‘Het Leidse Lint’ here.

The design team consisted of:
VVKH, Jan Maurits van Linge (landscape office Xi-ontwerp), Simon Akaya (npk design), Yasmin Stip (Stip werkt), Harma van der Meer (TU Delft), and *Ada Jaśkowiec.

At the beginning of the Kruisweg, the housing project ‘Gemaalhuis’ marks the entrance to Hoofddorp. In collaboration with Timpaan, RROG Urban Planning and Landscape and IBB, moes have been realized in a place where offices used to dominate in the past.

The design for 83 dwellings near the center of Hoofddorp provides a transition between the village ribbon development along the Kruisweg and the large, urban scale that Hoofddorp aspires to. At the design site, the original polder structure was situated perpendicular to the direction of the rest of the Haarlemmermeer. In the design, a passage has been made here in the building block: a quiet residential court without cars and shared use of public space. The buildings are all-sided, refers to the past and seems to have been there for some time without being historicizing. The architecture is robust and stony. Rich brick details refer to the steam pumping stations that stood at the beginning of the creation of Hoofddorp. The complex is a neighbourhood in itself and has variety of housing typologies; single-family houses, veranda houses, terrace houses and apartments. The apartments are designed as freely divisible lofts.

The homes were completed in June 2020.